News

News Releases

Alberta Star Reports Assay Results from its 2008 Drilling Program

November 24, 2008

Alberta Star Development Corp., (the “Company”) listed on the TSX Venture Exchange (ASX), on the OTCBB (ASXSF), and on the Frankfurt Exchange (QLD), is pleased to announce that all assay data has been received and compiled from its 2008 drilling program on its Eldorado/Contact Lake Projects in the Northwest Territories. During the 2008 summer program, seventeen drill holes were completed for a total of 2,348 meters drilled. The drill hole program followed-up on 2007 drilling on the Skinny Lake and K-2 target areas and tested three new target areas, K-4, Long Bay, and Gossan Island.

SKINNY LAKE AREA

The Skinny Lake target area, approximately 16 kilometers southeast of the Eldorado/Echo Bay uranium-silver mines, is a northwest trending zone of sulfide (gossan) mineralization. The host rocks are a sequence of andesitic tuff and flows showing strong phyllic alteration at higher levels and magnetite-actinolite-apatite alteration at depth. The 2008 drill program consisted of five holes for a total of 1,005 meters at the Skinny Lake target area. Drill holes SL-08-03, -04, -05, and -06 targeted a strong sulfide (gossan) zone and followed-up on drill hole SL-07-01 which intersected 22.50 meters (true width not determined) of 2% zinc, 18.35 g/tonne silver and 0.025% cobalt (see NR of January 18, 2008 results). All five holes of the program intercepted zones of zinc-silver mineralization (see highlights below). Drill hole SL-08-07 targeted the down dip extension of outcropping copper mineralization within a strong alkali-magnetite altered zone.

Assay highlights from the 2008 drilling program at Skinny Lake area:
 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Au

Co

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

SL-08-03

4.50

5.50

1.00

0.139

0.004

0.010

1.6

0.031

0.038

7.00

9.00

2.00

0.041

0.006

0.011

0.4

0.007

0.028

12.00

13.00

1.00

0.110

0.002

0.023

0.5

0.020

0.015

39.00

42.00

3.00

0.046

0.012

0.034

0.8

0.019

0.025

43.00

44.00

1.00

0.018

0.018

0.114

0.4

0.012

0.008

47.00

58.00

11.00

0.025

0.019

0.201

0.7

0.008

0.016

48.80

49.50

0.70

0.047

0.036

0.443

5.8

0.048

0.033

64.00

65.50

1.50

0.012

0.033

0.281

0.6

0.005

0.036

68.50

70.00

1.50

0.015

0.013

0.144

0.4

0.004

0.036

83.50

93.00

9.50

0.052

0.080

0.799

5.6

0.021

0.012

84.00

87.00

3.00

0.023

0.044

1.590

7.3

0.016

0.006

85.50

87.00

1.50

0.023

0.052

2.040

8.2

0.018

0.006

83.50

112.50

29.00

0.065

0.054

0.364

2.919

0.025

0.013

96.00

96.50

0.50

0.345

0.052

1.240

2.8

0.023

0.005

98.00

99.50

1.50

0.042

0.085

0.161

1.2

0.014

0.011

109.50

117.00

7.50

0.030

0.020

0.094

0.9

0.016

0.040

111.00

138.00

27.00

0.007

0.005

0.034

<0.1

0.003

0.037

146.00

153.50

7.50

0.003

0.037

0.040

<0.1

0.001

0.032

161.00

170.50

9.50

0.001

0.002

0.013

<0.1

0.001

0.039

172.50

208.00

35.50

0.003

0.003

0.031

<0.1

0.002

0.044

150.50

152.00

1.50

0.011

0.173

0.092

0.7

0.002

0.036

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Co

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

SL-08-04

24.50

25.50

1.00

0.029

0.008

0.136

1.0

0.009

0.029

28.50

30.00

1.50

0.035

0.044

0.140

0.9

0.011

0.025

33.00

34.50

1.50

0.023

0.015

0.143

0.5

0.005

0.051

41.00

43.00

2.00

0.033

0.005

0.110

1.1

0.016

0.026

67.00

68.50

1.50

0.110

0.007

0.035

3.3

0.015

0.025

70.00

79.00

9.00

0.066

0.010

0.050

0.8

0.019

0.010

73.00

74.50

1.50

0.070

0.020

0.123

0.8

0.013

0.009

79.00

160.00

81.00

0.085

0.073

0.571

24.9

0.015

0.021

100.70

102.00

1.30

0.259

0.143

1.110

66.3

0.007

0.029

112.50

119.50

7.00

0.356

0.503

4.451

22.7

0.028

0.008

114.00

115.50

1.50

0.454

0.875

6.850

15.0

0.035

0.006

115.50

117.00

1.50

0.511

0.685

6.360

25.1

0.023

0.009

115.50

119.50

4.00

0.414

0.437

4.024

31.5

0.025

0.008

160.00

175.00

15.00

0.045

0.006

0.014

0.7

0.017

0.016

166.00

175.00

9.00

0.045

0.005

0.008

0.7

0.016

0.016

175.00

178.00

3.00

0.017

0.044

0.190

0.6

0.006

0.016

179.50

185.50

6.00

0.024

0.002

0.005

0.5

0.011

0.019

190.00

194.50

4.50

0.054

0.001

0.004

0.7

0.016

0.013

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Ni

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

SL-08-05

14.50

18.50

4.00

0.033

0.015

0.319

0.94

0.002

0.025

33.00

34.00

1.00

0.058

0.017

0.183

1.20

0.003

0.030

40.00

97.50

57.50

0.045

0.065

0.283

1.86

0.002

0.020

68.50

70.00

1.50

0.018

0.063

1.120

7.30

0.003

0.024

79.00

80.50

1.50

0.092

0.420

1.820

6.20

0.002

0.013

83.50

85.00

1.50

0.109

0.316

1.300

6.10

0.002

0.018

105.00

145.50

40.50

0.038

0.051

0.237

3.33

0.004

0.017

149.00

165.00

16.00

0.031

0.006

0.047

0.42

0.032

0.031

162.50

165.00

2.50

0.022

0.019

0.179

0.56

0.012

0.048

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Co

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

SL-08-06

10.00

88.90

78.90

-

-

-

-

-

0.031

30.00

35.30

5.30

0.085

0.012

0.152

1.79

0.012

0.035

47.85

49.35

1.50

0.013

0.038

0.241

1.60

0.018

0.030

55.50

57.00

1.50

0.007

0.004

0.155

0.50

0.005

0.037

60.50

61.50

1.00

0.215

0.026

0.092

4.60

0.025

0.036

69.25

70.87

1.62

0.021

0.017

0.148

0.70

0.003

0.024

72.30

87.10

14.80

0.098

0.341

0.465

8.00

0.011

0.033

78.30

81.30

3.00

0.031

0.536

1.250

10.25

0.016

0.037

82.60

84.10

1.50

0.016

1.690

0.971

8.40

0.010

0.022

75.30

76.80

1.50

0.037

0.090

0.048

1.50

0.005

0.036

84.10

85.60

1.50

0.310

0.125

0.021

4.10

0.011

0.048

90.00

181.00

91.00

-

-

-

-

-

0.028

105.00

108.00

3.00

0.017

0.158

0.272

3.20

0.007

0.026

129.00

143.00

14.00

0.058

0.016

0.292

1.64

0.012

0.024

167.60

168.60

1.00

0.196

0.003

0.011

5.20

0.043

0.012

171.50

214.00

42.50

0.043

0.016

0.093

0.61

0.013

0.018

185.50

193.00

7.50

0.023

0.030

0.079

0.54

0.009

0.016

200.50

205.00

4.50

0.047

0.015

0.187

0.57

0.015

0.019

209.80

214.00

4.20

0.099

0.011

0.149

1.88

0.012

0.019

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

SL-08-07

3.00

7.50

4.50

0.177

0.003

0.048

0.50

16.50

22.50

6.00

0.416

0.001

0.024

0.68

34.50

39.00

4.50

0.137

0.001

0.015

0.50

43.50

46.50

3.00

0.374

0.002

0.052

0.65

69.00

70.50

1.50

0.049

0.001

0.005

0.10

110.00

112.00

2.00

0.102

0.001

0.006

0.20

 


Drill hole SL-08-03 had an azimuth of 225 degrees and an inclination of 60 degrees. SL-08-04 was a vertical hole. SL-08-05 had an azimuth of 208 degrees and an inclination 45 degrees. SL-08-06 was a vertical hole, and SL-08-07 had an azimuth of 45 degrees and an inclination 60 degrees.

K-2 TARGET AREA

The K2 target area is located in the south-central portion of the Contact Lake project area, on the south side of Echo Bay on the Contact Lake property. The area is approximately 9 kilometres southeast of the Eldorado/Echo Bay uranium-silver mines and consists of multiple zones of altered, mineralized breccias. The 2008 drilling program in the K2 area consisted of three holes for a total of 803 meters that followed-up on the 2006 and 2007 drill programs that discovered disseminated and vein hosted copper and other sulfide mineralization. Drill hole K2-08-21 only encountered altered rock but only sparse mineralization. Drill holes K2-08-20 and -22 intercepted multiple zones of altered and mineralized breccias with disseminated and vein hosted copper mineralization.

Assay highlights from the 2008 drilling program at K-2 area:

 

 

 

Drill Hole

From

To

Interval

Cu

Zn

Co

Ag

Au

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(g/ton)

(%)

K2-08-20

4.00

215.00

211.00

-

-

-

-

-

0.028

28.00

29.50

1.50

0.113

0.013

0.007

0.60

-

0.031

57.00

58.30

1.30

0.140

0.026

0.011

1.00

-

0.032

66.50

68.65

2.15

0.186

0.015

0.003

0.41

-

0.026

73.50

83.00

9.50

0.141

0.017

0.004

0.49

-

0.032

93.15

96.00

2.85

0.149

0.014

0.003

0.56

-

0.032

178.00

181.00

3.00

0.214

0.010

0.010

0.70

-

0.023

184.00

185.50

1.50

0.185

0.007

0.013

0.40

-

0.022

236.50

245.50

9.00

0.139

0.006

0.003

0.48

-

0.013

250.00

263.50

13.50

-

-

-

-

-

0.026

272.50

274.00

1.50

0.168

0.009

0.006

0.30

-

0.021

277.50

279.00

1.50

0.142

0.005

0.005

0.30

-

0.014

283.50

285.36

1.86

0.216

0.008

0.004

0.70

1

0.014

 

 

 

Drill Hole

From

To

Interval

Cu

Zn

Co

Ag

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

K2-08-21

6.00

9.00

3.00

0.393

0.016

0.003

1.10

0.028

15.00

16.50

1.50

0.110

0.010

0.007

0.20

0.012

46.50

48.00

1.50

0.002

0.005

0.012

0.10

0.015

91.00

92.50

1.50

0.001

0.016

0.019

0.10

0.023

91.00

95.50

4.50

0.001

0.013

0.009

-

0.025

105.50

137.00

31.50

0.002

0.012

0.003

-

0.027

148.00

157.00

9.00

0.001

0.011

0.003

-

0.028

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Co

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

K2-08-22

16.90

18.40

1.50

0.154

0.001

0.011

0.2

0.003

40.50

43.40

2.90

0.141

0.001

0.008

0.3

0.009

44.50

46.00

1.50

0.124

0.001

0.013

0.3

0.005

51.50

66.00

14.50

0.227

0.001

0.013

0.9

0.004

72.00

73.50

1.50

0.165

0.002

0.014

0.8

0.007

85.20

87.50

2.30

0.148

0.001

0.012

0.7

0.016

100.50

101.50

1.00

0.058

0.002

0.014

0.7

0.025

129.50

130.50

1.00

0.350

0.002

0.018

1.1

0.034

132.35

133.70

1.35

0.147

0.003

0.018

2.9

0.148

137.70

139.20

1.50

0.221

0.003

0.018

1.0

0.057

126.00

141.00

15.00

0.075

0.002

0.013

1.1

0.044

145.00

146.50

1.50

0.100

0.002

0.012

0.4

0.015

155.50

157.00

1.50

0.134

0.001

0.019

0.7

0.033

167.50

174.00

6.50

0.024

0.002

0.014

1.4

0.031

180.00

181.50

1.50

0.016

0.002

0.010

0.8

0.048

193.50

195.50

2.00

0.186

0.002

0.020

1.0

0.016

233.00

234.50

1.50

0.175

0.006

0.068

1.7

0.007

250.00

250.50

0.50

0.201

0.004

0.081

0.7

0.003

258.30

259.80

1.50

0.018

0.025

0.294

0.3

0.004

263.00

264.50

1.50

0.028

0.068

0.237

1.3

0.004

272.00

273.50

1.50

0.034

0.009

0.208

0.6

0.004

290.00

293.00

3.00

0.205

0.003

0.038

2.0

0.007

294.00

295.10

1.10

0.140

0.003

0.041

1.6

0.012

309.50

311.00

1.50

0.342

0.003

0.032

1.4

0.016


K2-08-20 had an azimuth of 215 and an Inclination of 45 degrees. K2-08-21 had an azimuth of 215 and an inclination of 85 degrees. K2-08-22 had an azimuth of 225 and an inclination of 45 degrees.

K4-URANIUM TARGET AREA:

The K4 target area is located approximately 2 kilometers east-southeast of the Eldorado/Echo Bay uranium-silver mines. Sampling and mapping indicated potential for high-grade uranium veins along east to northeast trending fractures in andesitic tuffs and breccias within zones of strong potassic-hematitic alteration. The 2008 drilling program at the K4 uranium target area consisted of six holes for a total of 536 meters. Drill hole K4-08-01, 08-02, 08-03 located near the west end of the target area, intercepted numerous intervals of significant copper-silver mineralization with some intervals accompanied by anomalous uranium. Drill holes K4-08-04, and 08-05 located in the central part of the target area, intercepted a number of intervals of significant copper-silver mineralization (see highlights below). Drill hole K4-08-06, at the east end of the target area, encountered only scattered mineralization.

Assay highlights from the 2008 drilling program at K-4 area:

 

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

U3O8

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

K4-08-01

3.15

6.00

2.85

0.183

0.009

0.006

3.83

0.001

8.25

9.00

0.75

0.844

0.001

0.067

16.90

0.000

10.80

12.25

1.45

0.201

0.001

0.007

0.40

0.001

18.25

21.25

3.00

0.079

0.001

0.003

1.20

0.001

52.53

53.21

0.68

0.123

0.014

0.026

5.43

0.017

52.53

52.82

0.29

0.237

0.024

0.030

9.60

0.034

 

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Co

U3O8

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

K4-08-02

3.10

16.50

13.40

0.111

0.026

0.011

4.74

0.018

0.001

8.10

11.10

3.00

0.169

0.046

0.013

7.10

0.021

0.001

11.10

12.10

1.00

0.086

0.019

0.006

4.70

0.054

0.001

35.50

37.00

1.50

0.255

0.002

0.022

0.70

0.004

0.000

39.50

44.00

4.50

0.153

0.005

0.008

1.80

0.020

0.001

50.00

51.00

1.00

0.398

0.008

0.012

4.90

0.015

0.001

51.89

56.00

4.11

0.216

0.007

0.016

1.06

0.002

0.006

51.89

52.00

0.11

0.083

0.015

0.007

2.00

0.009

0.058

52.00

54.00

2.00

0.358

0.007

0.004

0.60

0.001

0.002

55.05

55.25

0.20

0.297

0.007

0.027

2.00

0.006

0.012

58.50

60.00

1.50

0.156

0.002

0.008

1.50

0.010

0.001

 

 

Drill Hole

From

To

Interval

Cu

Ag

Co

U3O8

 

(m)

(m)

(m)

(%)

(g/ton)

(%)

(%)

 

3.00

18.00

15.00

0.149

3.60

0.024

0.001

K4-08-03

9.00

22.50

13.50

0.186

4.24

0.015

0.002

 

12.00

13.50

1.50

0.287

4.7

0.012

0.006

 

59.00

60.50

1.50

0.169

0.4

0.009

0.001

 

 

Drill Hole

From

To

Interval

Cu

Pb

Zn

Ag

Co

U3O8

 

(m)

(m)

(m)

(%)

(%)

(%)

(g/ton)

(%)

(%)

K4-08-04

3.00

4.50

1.50

0.111

0.004

0.006

1.90

0.033

0.000

9.00

101.50

92.50

-

-

-

-

-

-

15.00

15.25

0.25

0.669

0.478

0.010

5.10

0.027

2.544

15.75

17.25

1.50

0.139

0.002

0.009

1.10

0.020

0.004

18.75

20.25

1.50

0.008

0.001

0.006

0.10

0.002

0.007

28.35

31.00

2.65

0.211

0.066

0.008

0.88

0.004

0.283

28.85

31.00

2.15

0.190

0.080

0.007

0.95

0.004

0.349

28.85

29.05

0.20

1.071

0.836

0.020

8.70

0.024

3.675

55.55

56.45

0.90

0.250

0.056

0.015

0.96

0.002

0.249

56.05

56.45

0.40

0.135

0.123

0.017

1.90

0.003

0.554

56.95

58.50

1.55

0.060

0.001

0.007

0.40

0.019

0.004

61.87

64.00

2.13

0.148

0.003

0.018

0.76

0.009

0.004

61.87

62.02

0.15

0.352

0.019

0.027

1.60

0.003

0.039

65.50

70.00

4.50

0.129

0.001

0.007

0.70

0.020

0.000

65.50

101.50

36.00

0.076

0.002

0.005

0.45

0.017

0.000

76.00

77.50

1.50

0.107

0.003

0.006

0.40

0.025

0.000

86.50

88.00

1.50

0.111

0.003

0.006

1.30

0.016

0.001

100.00

101.50

1.50

0.109

0.003

0.005

1.00

0.030

0.000

 

 

Drill Hole

From

To

Interval

Cu

Pb

Ag

U3O8

V2O5

 

(m)

(m)

(m)

(%)

(%)

(g/ton)

(%)

(%)

K4-08-05

4.57

6.00

1.43

0.167

0.002

0.60

0.000

0.009

10.50

92.50

82.00

-

-

-

-

0.038

20.69

21.45

0.76

0.332

0.098

1.72

0.453

0.048

21.16

21.45

0.29

0.504

0.247

3.70

1.154

0.053

34.00

35.50

1.50

0.151

0.001

0.30

0.000

0.066

39.75

49.59

9.84

0.296

0.035

1.17

0.162

0.031

41.24

41.62

0.38

1.061

0.615

7.10

3.192

0.043

47.25

47.62

0.37

0.596

0.139

3.00

0.789

0.040

 

 

Drill Hole

From

To

Interval

Cu

Zn

Ni

U3O8

V2O5

 

(m)

(m)

(m)

(%)

(%)

(%)

(%)

(%)

K4-08-06

3.55

17.5

13.95

0.010

0.004

0.002

0.000

0.025

25

28

3

0.059

0.011

0.001

0.004

0.007

38.5

40

1.5

0.028

0.012

0.001

0.003

0.006

 


K4-08-01 had an azimuth of 85 and an inclination of 60 degrees. K4-08-02 had an azimuth of 170 and an inclination of 45. K4-08-03 had an azimuth of 10 and an inclination of 45 degrees. K4-08-04 had an azimuth of 352 and an inclination of 45 degrees. K4-08-05 had an azimuth of 352 and an inclination of 65 degrees at the same location as 04, and K4-08-06 had an azimuth of 012 and an inclination of 45 degrees.

LONG BAY AREA

At the Long Bay target area located approximately 1.5 kilometers northwest of the Eldorado/Echo Bay uranium-silver mines, sampling and mapping indicated potential for uranium within a stockwork vein system along an east-west trending structure in andesitic tuffs with strong hematitic alteration. Two drill holes, LB-08-01 and LB-08-02, were completed for a total of 125 meters in the Long Bay area. LB-08-02 intercepted andesitic tuffs and breccias with strong hematitic alteration with minor scattered sulfides. Drill hole LB-08-01 intercepted an unmapped diabase dike but returned anomalous copper values along fractures zones.

Assay highlights from the 2008 drilling program at Long Bay:

 

 

 

Drill Hole

From

To

Interval

Cu

Zn

Ag

V2O5

 

(m)

(m)

(m)

(%)

(%)

(g/ton)

(%)

LB-08-01

5.8

11.5

5.7

-

-

-

0.023

9

11.5

2.5

0.158

0.022

0.4

0.025

29.8

29.95

0.15

0.126

0.017

0.1

0.065

46

93.27

47.27

-

-

-

0.023

 

 

 

Drill Hole

From

To

Interval

V2O5

LB-08-02

(m)

(m)

(m)

(%)

 

8.31

31.7

23.39

0.024


LB-08-01 had an azimuth of 147 and an inclination of 45. LB-08-01 had an azimuth of 170 and an inclination of 45.

GOSSAN ISLAND AREA:

The Gossan Island target, located approximately 5 kilometers southeast of the Eldorado/Echo Bay uranium-silver mines, consists of zones of moderate to strong gossanous, argillic-potassic altered, pyroclastic rocks. One reconnaissance drill hole, GI-08-01, was completed for a total of 147 meters on the Gossan island target area. Drill hole GH-08-01 targeted a strong gossanous zone, and possible vein system. The drill hole intercepted highly brecciated, strong hematitic-potassic altered, andesitic tuff accompanied by scattered sulfides, but only one interval with anomalous silver was encountered.

 

 

 

Drill Hole

From

To

Interval

Ag

GI-08-01

(m)

(m)

(m)

(g/ton)

 

26.00

27.50

1.50

4.5


LB-08-01 had an azimuth of 147 and an inclination of 45. LB-08-01 had an azimuth of 170 and an inclination of 45.

(Note: True widths of intercepts have not been determined.)

All mapping, surface sampling, and drill-hole data from the 2008 drilling program are being compiled and integrated into the Company’s database. During the Fall/Winter of 2008 the Company is planning a thorough review of the numerous IOCG, uranium and polymetallic vein targets it has developed during the past three exploration seasons.

The Company continues to review and reduce its exploration and overhead costs, ensuring that the Company’s capital is preserved until the financial markets stabilize in this unprecedented financial downturn. The Company continues to review and pursue advanced stage economic mineral deposits as well as other opportunities. The Company has no debt.

The Company feels that the corporate funds are better used to seek and acquire strategic alternatives and opportunities which are being presented to Alberta Star. In today’s turbulent market, it is cheaper to buy production than to explore and drill for production and resources.

Alberta Star is currently reviewing a number of advanced stage mineral exploration projects that meet the Company’s corporate acquisition criteria, of acquiring established resource opportunities with infrastructure, with cash flow or near term cash flow potential and advanced stage exploration potential. Due to the current unrest in global market conditions, the Company has elected to conserve its treasury and target the many unique opportunities that exist for well financed companies like Alberta Star, to acquire high quality mineral assets at very attractive valuations. The Company has been conserving cash, reducing costs and reducing its field operations, for some time now, and is now in a position to capitalize with the current deep and protracted downturn in the global capital markets.

THE ELDORADO/CONTACT LAKE PROJECT:

The Eldorado & Contact Lake Permit Areas are located on the east side of Great Bear Lake in Canada’s Northwest Territories. The permit areas are situated 470 kilometres north of the city of Yellowknife. The total size of the Eldorado & Contact Lake Permit area covers over 116,633 acres. The Eldorado/Contact project areas include past producing high grade silver and uranium mines. The Contact Lake and Eldorado districts are being targeted by the Company for silver, copper, uranium, and polymetallic mineralization. The mineralization occurs within the same suite of volcano-plutonic rocks that host other polymetallic zones in the Eldorado and Contact Lake Mineral Belt, including the former Bonanza and El Bonanza Silver mines and the Eldorado and Contact Lake Uranium (plus-Ag-Cu-Co-Ni-Bi) mines. Veins of the former Eldorado and Echo Bay silver & uranium mines are situated in tuff/metasedimentary rocks, near the margins and apices of porphyry stocks of the Great Bear Magmatic Zone. The cores and intermediate zones of the hydrothermal systems that are responsible for these veins are possible loci for larger, more typical, bulk-mineable IOCG-type deposits.

ALBERTA STAR DEVELOPMENT CORP.:

Alberta Star is a Canadian mineral exploration company that identifies, acquires, finances advanced stage mineral exploration projects in Canada and the United States. The Company is committed to creating long term shareholder value through the discovery of base and precious metals and uranium.

INVESTOR RELATIONS:

Investors are welcomed to contact Mr. Allan Feldman, Alberta Star’s In-house Investor Relations and Corporate Communications Specialist, for all corporate updates at (604) 948-9663.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Tim Coupland, President and CEO
Alberta Star Development Corp.
Tel 604.681.3131
Fax 604.408.3884
www.elyseedevelopment.com

ALBERTA STAR DEVELOPMENT CORP.

Tim Coupland
President & CEO

These results have been reviewed by Dr. Michael Bersch, LPG, who is designated as a Qualified Person with the ability and authority to verify the authenticity and validity of this data. All rock samples were analyzed by Acme Analytical Laboratories Ltd. (“ACME”) in Vancouver B.C., Canada using ICP-MS and ICP-FA analysis techniques.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this News Release.

This news release contains certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical fact, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans” “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Information inferred from the interpretation of drilling results and information concerning mineral resource estimates may also be deemed to be forward looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements.

Except for the statements of historical fact contained herein, certain information presented constitutes “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995. Such forward-looking statements, including but not limited to, those with respect to potential expansion of mineralization, potential size of mineralized zone, timing of resource calculation and size of exploration program involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of Alberta Star Development Corp. to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks related to international operations and joint ventures , the actual results of current exploration activities, conclusions of economic evaluations, uncertainty in the estimation of ore reserves and mineral resources, changes in project parameters as plans continue to be refined, future prices of gold, silver, uranium and base metals, environmental risks and hazards, increased infrastructure and/or operating costs, labor and employment matters, aboriginal and government regulation and permitting requirements as well as those factors discussed in the section entitled “Risk Factors” in Alberta Star’s Annual Information form and Alberta Star’s latest Form 20-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although Alberta Star has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Alberta Star disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements.

For further information investors should review the Company’s filings that are available at www.sedar.com or contact Tim Coupland, President at (604) 681-3131.

 

 


© 2024 Elysee Development Corp.
All rights reserved.